Subsea Tree Actuator Valve Reinstatement System (PCOL System) MMA engineered and manufactured the PCOL (Platform Controlled Override Linear) system as a permanent solution to overcome all the problems of temporary LAOT’s. Category: Our Experience, United Kingdom, Manufacture & Refurbishment of Subsea Structures Read More
DomGas Pipeline Inspection In December 2014, MMA conducted a 60km inspection campaign of the DomGas pipeline. Category: Our Experience, Australasia, Inspection, Maintenance & Repair Read More
Wheatstone Trunkline Microtunnel Grouting MMA completed the grouting of the Wheatstone Trunkline into the shore crossing microtunnel in 2014. Category: Our Experience, Australasia, Specialist Subsea Engineering Read More
APLNG RORO Protection MMA supplied scour protection system for the FLNE RoRo Ramp. Category: Our Experience, Australasia, Specialist Subsea Engineering Read More
Crest Odyssey 2 Campaign In 2013, MMA performed various campaigns on-board the 82m DP2 Dive Support Vessel, the Crest Odyssey 2, on the North West Shelf of Western Australia. Category: Our Experience, Australasia, Inspection, Maintenance & Repair, Survey & Positioning Read More
Ichthys MOF Berths MMA was contracted by BAM Clough to supply the high-performance scour protection system for berth pockets. Category: Our Experience, Australasia Read More
Flying Lead Crossing – Upper Pyrenees McDermott was contracted with the design, procurement, fabrication, transportation and installation of 77km of a 20 inch pipeline, subsea umbilicals and flexibible flowlines. MMA was awarded to provide 450 off 70kg flying lead grout bags Category: Our Experience, Australasia Read More
Qatar Gas IRM As part of their Schiehallion Quad 204 drilling campaign, BP employed a Generation-6 semi-submersible rig for the drilling operations. Category: Our Experience, Middle East, Inspection, Maintenance & Repair, Survey & Positioning, Stabilisation & Scour Protection, Specialist Subsea Engineering Read More
Ichthys Geophysical Survey MMA conducted an 875km pipeline route survey, the longest of its kind in Australia, on the Ichthys Gas Field Development in 2008. Category: Our Experience, Australasia, Survey & Positioning Read More