Julimar Walking Mitigation 01 June 2021 MMA was awarded the full remedial scope for 23 caissons as part of the bi-annual maintenance program. Category: Australasia, Manufacture & Refurbishment of Subsea Structures Read More
Subsea Valve System (SVS) for Life of Field Extension 10 December 2018 MMA has developed an innovative Subsea Valve System (SVS) that reinstates the full functionality of the XT without having to refurbish or replace the XT and with significant reduced production down time. Category: Our Experience, United Kingdom, Manufacture & Refurbishment of Subsea Structures Read More
Rota Pipeline Crossing Sleepers Allseas contracted MMA to design and fabricate two sleepers to place as new supports on either side of the Rota 2 pipeline. Category: Our Experience, South East Asia, Specialist Subsea Engineering, Manufacture & Refurbishment of Subsea Structures Read More
Turkstream Dropped Object Culverts MMA was contracted to design, engineer and fabricate ten (10) culverts to protect the pipeline from dropped objects. Category: Our Experience, United Kingdom, Specialist Subsea Engineering, Manufacture & Refurbishment of Subsea Structures Read More
OMV Maari Jacket Leg Repair MMA worked with the Client and Worley Parsons to deliver a high strength grouted connection between the jacket leg member and an internally placed mandrel. Category: Our Experience, Australasia, Manufacture & Refurbishment of Subsea Structures Read More
Cape Preston Berth Pocket To accommodate a new 170m long vessel, Citic Pacific required the port’s berthing pocket to be deepened from 10m to 11m. Category: Our Experience, Australasia, Stabilisation & Scour Protection, Manufacture & Refurbishment of Subsea Structures Read More
Quad 204 - Wellhead Strengthening System 13 May 2016 As part of their Schiehallion Quad 204 drilling campaign, BP employed a Generation-6 semi-submersible rig for the drilling operations. Category: Our Experience, United Kingdom, Manufacture & Refurbishment of Subsea Structures Read More
Subsea Tree Actuator Valve Reinstatement System (PCOL System) 13 May 2015 MMA engineered and manufactured the PCOL (Platform Controlled Override Linear) system as a permanent solution to overcome all the problems of temporary LAOT’s. Category: Our Experience, United Kingdom, Manufacture & Refurbishment of Subsea Structures Read More