Rota Pipeline Crossing Sleepers Allseas contracted MMA to design and fabricate two sleepers to place as new supports on either side of the Rota 2 pipeline. Category: Our Experience, South East Asia, Specialist Subsea Engineering, Manufacture & Refurbishment of Subsea Structures Read More
Turkstream Grouted Pipeline Supports 02 January 2018 To reduce pipeline stresses, 4 grouted supports (2 at each touchdown point, on either side of the shoulder) were installed. Category: Our Experience, United Kingdom, Survey & Positioning, Specialist Subsea Engineering Read More
Turkstream Dropped Object Culverts MMA was contracted to design, engineer and fabricate ten (10) culverts to protect the pipeline from dropped objects. Category: Our Experience, United Kingdom, Specialist Subsea Engineering, Manufacture & Refurbishment of Subsea Structures Read More
APLNG RORO Protection MMA supplied scour protection system for the FLNE RoRo Ramp. Category: Our Experience, Australasia, Specialist Subsea Engineering Read More
Wheatstone Trunkline Microtunnel Grouting MMA completed the grouting of the Wheatstone Trunkline into the shore crossing microtunnel in 2014. Category: Our Experience, Australasia, Specialist Subsea Engineering Read More
Qatar Gas IRM 13 May 2010 As part of their Schiehallion Quad 204 drilling campaign, BP employed a Generation-6 semi-submersible rig for the drilling operations. Category: Our Experience, Middle East, Inspection, Maintenance & Repair, Survey & Positioning, Stabilisation & Scour Protection, Specialist Subsea Engineering Read More