Overview
The MMA Majestic operates predominately for our clients in the South East Asia region but has performed a number of scopes in Australia. The vessel is an ideal asset for anchor handling scopes, ocean towing and general supply requirements. The vessel’s dynamic positioning provides ideal manoeuvrability for working alongside offshore facilities and its cargo capacity provides reliable supply support.
Enquire Today
Key Features
- Notation:
✠A1, Towing Vessel, AH, Fire Fighting Vessel Class 1, Offshore Support Vessel, SPS, (E), ✠AMS, ✠ACCU, ✠DPS-2, BP 160.7 tonne, SPS
- Built:
Built in 2014 by PT. Jaya Asiatic Shipyard
- Port of Registry & Flag:
Labuan Flag
- Deck Space:
580 m² free deck space at 5.5 t/m² deck strength
- Bollard Pull:
160.7 tonnes bollard pull is ideal for ocean towing scopes
- BHP:
12,070 BHP
Vessel Summary
- PARTICULARS
- Vessel Type Anchor Handling Tug Supply
- IMO Number 9657935
- Official Number/Call Sign 900092/9WNJ8
- Port of Registry Labuan
- Year Built 2014
- Class ABS
- Notation ✠A1, Towing Vessel, AH, Fire Fighting Vessel Class 1, Offshore Support Vessel, SPS, (E), ✠AMS, ✠ACCU, ✠DPS-2, BP 160.7 tonne, SPS
- DETAILS
- Length Overall 78.20 m
- Breadth 18.50 m
- GRT-NRT 3,607/1,332
- Deadweight 3,500 t
- Depth Moulded 8.0 m
- Maximum Draft 6.6 m
- Clear Deck Space 580 m2
- Deck Loading 800 t
- Max Speed 12 kts
- Economical Speed 8 kts
- Bollard Pull 160.7 t
- Sewage Plant 1 x 50 men, Evac MBR16C
- Rudders 2 x Becker
- Joystick Kongsberg
- Flow Meter Fitted
- CAPACITY
- Fuel Oil 1,197.1 m³
- Potable Water 316 m³ (same as FW)
- Drill Water 450 m³
- Oil Based Mud 185 m³
- Dispersant 23.3 m³
- Dry Bulk 330.8 m³ (incl 2 cement Tk.)
- Foam 23.3 m³
- Rig Chain Locker 159 m³ each side, approx
- PUMPING RATES
- Fuel Oil 2 x 200 m³/hr @ 90 m head
- Potable Water 1 x 150 m³/hr @ 90 m head
- Drill Water 1 x 200 m³/hr @ 90 m head
- Oil Based Mud 2 x 75 m³/hr @ 240 m head
- Dry Bulk 2 x 25 m³/hr @ 8 bar
- MACHINERY
- Main Engines 2 x Wartsila 9L 32 4,500 kW
- Generators 2 x Caterpillar 550 kW
- Emergency Generators 1 x 95 ekW @ 1,800 rpm
- Bow Thruster 2 x 600 kW (11 ton) Tunnel Type
- Stern Thruster 2 x 600 kW (11 ton)
- Propulsion 2 x CPP
- DYNAMIC POSITIONING
- DP - System DP-2
- DGPS - Quantity 2
- Fanbeam - Quantity Nil
- Microwave Reference Mini Radascan
- Accoustic Sensor / HPR 1 x HIPAP (High Precision Accoustic Positioning) - 500
- Laser Based System 1 x CyScan MK IV
- ACCOMMODATION
- Berths 1 x 6, 2 x 20
- Total 46
- FIRE FIGHTING
- Class 1
- Monitors 2 x 1,200 m³/hr
- Pumps 2 x 1,910 m³/hr
- DECK EQUIPMENT - Towing Winch
- Type Electro-hydraulic, waterfall type, Brattvaag
- Pull 300 T @ 0-10.2 m/min
- Brake Holding 450 T
- Wire Capacity 76 mm x 2,000 m
- DECK EQUIPMENT - Anchor Handling Winch
- Type Electro-hydraulic, waterfall type, Brattvaag
- Pull 300 mt @ 0-10.2 m/min
- Brake Holding 450 T
- Wire Capacity 76 mm x 2,000 m
- DECK EQUIPMENT - Tugger Winch
- Number & Capacity 2 x 10 mt @0-32 m/min, electro-hydraulic Brattvaag AKMX4115
- Wire Capacity 25 mm x 200 m
- Other Deck Equipment
- Storage Drum 2 x Brattvaag ALMX6307, Ø1.000/2.600 mm x 2.700 mm L, Ø76 mm x 2.000 m SWR Pull:6.7 mt @ 0-44 m/min
- Towing Pins 4 x 300 t Karmoy
- Shark Jaws 2 x 300 t Karmfork
- Stern Roller 1 x 500 t 4.5 m x 2.3 m MWL
- Crane 1 x Electro-Hydraulic Telescopic Boom (5 T @ 15 m, 7.5 T @ 5 m)
- Deck Voltage & Sockets 2 x 440V, 2 x 220V (60Hz)
- Water Maker 2 x 5 m³/Day
- Anchor Windlass Gypsies: suitable for 50 min ø chains
- LIFESAVING
- Life rafts 6 x 25 men
- Lifejackets 58
- FRC/Rescue Boat/Davit 1 x 13 person Jiangyin Xinjiang GJ6.OB-1 RB
- Lifebuoys 8
- Immersion Suits 52
Projects
MMA Offshore was contracted by the Australian Government, Department of Defence to undertake the Cape Barren to Babel Island Hydrographic Survey.
MMA Offshore is a primary contractor to oil and gas operators, providing autonomous underwater vehicle solutions to collect seafloor and sub-seafloor data to assist in the engineering design of subsea infrastructure.
MMA Offshore was contracted by the Australian Government, Department of Defence to undertake the Mavis Reef (East), Bonaparte Archipelago Hydrographic Survey. The objective of the Survey was to update Australian Hydrographic Office Charts AUS730, AUS732, AUS320 and AUS323 through the provision of safety of navigation hydrographic surveys.
MMA was contracted by Allseas for the provision of grouting services and grout material on two drilling platforms that are to be decommissioned on the UK Continental Shelf.
MMA designed, fabricated and installed nine buoyant ‘sculptural reef flutes’ individually tethered to the seafloor by reinforced concrete and steel pyramids.
DPIRD awarded MMA an EPCI contract for an artificial reef to be installed 7km off the coast of Hillarys, Western Australia.