Overview
The MMA Crystal is a key marine asset for MMA. The vessel has a strong track record in South East Asia and Australasia carrying out various towing and anchor handling scopes and now operates in Taiwan. The vessel is fitted with 35T A-Frame and working class ROV as well as extensive survey equipment capable of geophysical and geotechnical operations.
Enquire Today
Key Features
- Notation:
✠A1, Offshore Support Vessel (AH), Fire Fighting Vessel Class 1, Towing Vessel, ✠AMS, ✠DPS-2
- Built:
2012
- Port of Registry & Flag:
Tai Chung (台中), Taiwan
- Deck Space (A-Frame Fitted):
275 m² free deck space
- Deck Space (A-Frame Removed):
450 m² free deck space
- Bollard Pull:
102.14 tonnes, ideal for towing scopes
- BHP:
The vessel has a total of 7,965 BHP
Vessel Summary
- PARTICULARS
- Vessel Type Anchor Handling Tug Supply
- IMO Number 9594212
- Port of RegistryTai Chung (台中)
- Year Built 2012
- Class ABS
- Notation ✠A1, Offshore Support Vessel (AH), Fire Fighting Vessel Class 1, Towing Vessel, ✠AMS, ✠DPS-2
- DETAILS
- Length Overall 70.05 m
- Breadth 17.0 m
- GRT-NRT 2,763/829
- Deadweight 2,515 t
- Depth Moulded 7.50 m
- Maximum Draft 6.10 m
- Deck Space (A-Frame Fitted) 275 m²
- Deck Space (A-Frame Removed) 450 m²
- Deck Loading 7.5 T / m²
- Max Speed 14.0 kts
- Economical Speed 10.0 kts
- Bollard Pull 102.14 t
- Sewage Plant 1 x 50 men , Evac Vacuum
- Rudders 2 x Becker Flap Type S A
- Joystick Bridge Mate
- Flow Meter Yes
- CAPACITY
- Fuel Oil 698.7 m³
- Potable Water 514.1 m³
- Drill Water Total capacity all D/W tank = 1,239 T if filled with fresh water and 1369 T if filled with sea water. Currently Tank No. 2, 4 and 5 filled with fresh water only for the rig with capacity 593.6 T
- Oil Based Mud Currently 2 tanks used for OBM with 100% capacity 140 m³ / 1762 bbls
- Dispersant 15.7 m³
- Dry Bulk 50 m³ in four tanks
- Foam 15.7 m³
- PUMPING RATES
- Fuel Oil 1 x 117 m³/hr @ 80 m head
- Potable Water 1 x 120 m³/hr @ 90 m head
- Drill Water 1 x 120 m³/hr @ 90 m head
- Oil Based Mud 2 x 75 m³/h @ 95 m head
- Dry Bulk 2 x 20 m³/hr
- MACHINERY / PROPULSION
- Main Engines2 x MaK 9M25 2,970 kW
- Bow Thruster2 x 600 kW Tunnel Type
- Stern Thruster1 x 600 kW tunnel type
- Shaft Generators 2 x 1,800 kW
- Generators 2 x Volvo Penta D12 MG 350 kW
- Emergency Generators1 x 99 ekW @ 1,800 RPM, Volvo penta radiator cooled, 440V/3Ph/60Hz
- Propulsion2 x CPP
- Power Supply Details440 V / 60 Hz
- DECK EQUIPMENT - Crane
- Crane PALFINGER Hyd Deck Crane PTM 400 2 T @ 12m / 5.9 T @ 2.2m
- DECK EQUIPMENT - Towing Winch
- Type Rolls Royce Electro-hydraulic
- Pull102.1 t
- Brake 250 t
- Wire Capacity 58mm x 1,400m
- DECK EQUIPMENT - Anchor Handling Winch
- Type Rolls Royce Electro-hydraulic
- Pull 65 MT stalling (high speed) and 210 MT stalling (slow speed)
- Brake Holding 250 t
- Wire Capacity 76 mm x 800 m
- DECK EQUIPMENT - Tugger Winch
- Number & Capacity 2 x 12 t Hydraulic
- Wire Capacity 24 mm x 220 m
- Other Deck Equipment
- Storage Drum 1 x Electro-hydraulic, Brattvaag, fixed Ø800/2 x L1,700 mm, for Ø58 mm x L1,500 m rope
- Towing Pins 2 x 300 t Karmoy
- Shark Jaws 1 x 300 t Karmfork
- Stern Roller 1 x 250 t 2.2 m x 4.8 m
- Crane 1 x 2 t @ 12 m / 5.9 t @ 2.2 m Palfinger Hyd Deck Crane PTM 400
- Deck Voltage & Sockets 2 x 415V, 2 x 220V
- Water Maker 2 x 5 m³/day reverse osmosis
- ACCOMMODATION
- Berths 1 x 10, 2 x 18
- Total 46
- FIRE FIGHTING
- Class 1
- Monitors 2 x 1,200 m³/hr
- Pumps 2 x 1,711 m³/hr
- LIFESAVING
- Liferafts6 x 25 man
- Lifejackets63
- Rescue Boat1 x 6 person Neuvisa RR-40 RB
- Lifebuoys8
- Immersion Suits 56
Projects
MMA Offshore was contracted by the Australian Government, Department of Defence to undertake the Cape Barren to Babel Island Hydrographic Survey.
MMA Offshore is a primary contractor to oil and gas operators, providing autonomous underwater vehicle solutions to collect seafloor and sub-seafloor data to assist in the engineering design of subsea infrastructure.
MMA Offshore was contracted by the Australian Government, Department of Defence to undertake the Mavis Reef (East), Bonaparte Archipelago Hydrographic Survey. The objective of the Survey was to update Australian Hydrographic Office Charts AUS730, AUS732, AUS320 and AUS323 through the provision of safety of navigation hydrographic surveys.
MMA was contracted by Allseas for the provision of grouting services and grout material on two drilling platforms that are to be decommissioned on the UK Continental Shelf.
MMA designed, fabricated and installed nine buoyant ‘sculptural reef flutes’ individually tethered to the seafloor by reinforced concrete and steel pyramids.
DPIRD awarded MMA an EPCI contract for an artificial reef to be installed 7km off the coast of Hillarys, Western Australia.