MMA WRAPS UP SURVEY WORK SCOPE FOR FORMOSA 2

MMA News

MMA recently wrapped up a survey work scope for the Formosa 2 Offshore Wind Farm Project located off the coast of Taiwan.

Formosa 2 offshore wind project is a joint venture project by JERA, Macquarie's Green Investment Group and Swancor Renewable Energy. The project is located between four and ten nautical miles off Miaoli County, with 376 MW installed capacity.

From our support DP2 vessel, the MMA Prestige, our survey team conducted several potential unexploded ordnance target investigations, and also ran 168km of magnetometer survey lines.

Our client provided positive feedback on the project deliverables, congratulating MMA’s entire team for their efforts and noting the consistent ‘one team’ approach shown by MMA and our subcontractors.

Well done to all involved on delivering a safe and successful result for our client.

Category: MMA News